BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Eastbourne NZ - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Eastbourne NZ
X-ORIGINAL-URL:https://eastbourne.nz
X-WR-CALDESC:Events for Eastbourne NZ
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20250405T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20250927T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20260404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20260926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20270403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20270925T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260525
DTEND;VALUE=DATE:20260706
DTSTAMP:20260701T011443
CREATED:20260520T060140Z
LAST-MODIFIED:20260520T060234Z
UID:4848-1779667200-1783295999@eastbourne.nz
SUMMARY:Shutdown of the main outfall pipeline to Pencarrow (up to 6 weeks)
DESCRIPTION:A shutdown of the main outfall pipeline that carries fully treated wastewater from the Seaview Wastewater Treatment Plant to Pencarrow will be in place for up to six weeks from Monday 25 May 2026. \nThe shutdown is for a planned programme of maintenance on the pipe\, pump stations\, and related machinery and installations\, to support resilience and operation of the pipeline. \nThe maintenance is being conducted in accordance with our resource consent with the Greater Wellington Regional Council. \nFor the shutdown and works to occur\, the pipeline needs to be emptied. This will involve discharging fully treated wastewater from the main outfall pipe from scour valves along the coast for a period up to five days from 25 May. \nTo keep the pipe empty for the duration of the maintenance works requiring the pipeline to be empty\, fully treated wastewater will also be discharged to the Waiwhetū Stream. There will also be limited discharges of groundwater from at least one scour valve along the coast while the pipeline is empty. \nThere will be public signage at each discharge location. While there are no expected health\, environmental\, or odour risks associated with these works\, people are advised to please read the signage and refrain from gathering kaimoana and swimming at the points of discharge. \nOur crews will be working at different locations along the pipeline concurrently to advance this work as quickly as possible\, which includes: \n\ninspecting the pipe and fixing leaks if required\nreplacing parts at scour valves along the pipeline\nmechanical parts renewals and maintenance at the pump station and vortex installations at Pencarrow Head\ngeneral maintenance along the pipeline\, for example at culverts and to manholes.\n\nFor more detail on the maintenance plan\, visit our website at Seaview Wastewater Treatment Plant. \nThere will be some traffic management in place for some of the works. We appreciate the impact of traffic management arrangements on the community and are working with Hutt City Council to finalise a plan to reduce the impact on you.  We will provide more information on dates and locations closer to the works starting. \nThank you for your patience while this important work is completed. \nWe will provider regular updates as this work progresses\, including on our Facebook page.
URL:https://eastbourne.nz/event/shutdown-of-the-main-outfall-pipeline-to-pencarrow/
CATEGORIES:Single
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
DTSTAMP:20260701T011443
CREATED:20260627T202327Z
LAST-MODIFIED:20260627T213929Z
UID:4959-1782864000-1782950399@eastbourne.nz
SUMMARY:Tiaki Wai is responsible for water services in the Wellington Region
DESCRIPTION:From 1 July\, Tiaki Wai will be responsible for delivering water services across Porirua\, Hutt Valley and Wellington.\n\n\nYou’ll contact Tiaki Wai directly to report a water fault or outage.\n\n\nUntil 1 July\, continue to contact your local council to report an immediate water issue.\n\n\nOur Facebook and Instagram pages will transition to Tiaki Wai over the coming week. If you already follow us\, you don’t need to do anything – you’ll continue to receive updates through this page.\n\n\nTiaki Wai is designed to help deliver the safe\, reliable\, and resilient water services Wellingtonians need now and into the future.\n\n\nFind out more: https://www.tiakiwai.co.nz
URL:https://eastbourne.nz/event/tiaki-wai-is-responsible-for-water-services-in-the-wellington-region/
CATEGORIES:Single,Water
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20260701T193000
DTEND;TZID=Pacific/Auckland:20260701T203000
DTSTAMP:20260701T011443
CREATED:20260627T091336Z
LAST-MODIFIED:20260627T091531Z
UID:4953-1782934200-1782937800@eastbourne.nz
SUMMARY:Community Patrol for Eastbourne / Bays?
DESCRIPTION:An initial information evening to discuss and explore what a Community Patrol could look like in Eastbourne has been set up for next Weds 1st July at 7.30 pm at O’Malleys. Please indicate if you would like to attend by contacting me\, Marni Stevenson 022 653 5159 or . I will need to get a rough estimate of numbers to confirm with the kind folk at O’Malleys who have offered their space for this initial meeting.\nI will provide a basic brief on volunteering\, the training involved\, the expectations/responsibilities of volunteering and the options available to us in setting up Community Patrol in Eastbourne\, based on guidance by Merv Theobold who runs the Petone patrol. Please note this is will be followed up with an actual session by Merv in 2-3 weeks time.\n\n\nAll those who are interested in hearing more are welcome.
URL:https://eastbourne.nz/event/4953/
LOCATION:O’Malley’s\, 612 Marine Drive\, Eastbourne\, Lower Hutt\, 5013\, New Zealand
CATEGORIES:Briefing,Community action,Featured,Information,Single
END:VEVENT
END:VCALENDAR